Friday, August 26, 2011

BRC - Rock 'n' Roll Half/Full Marathon training - Week 4 Long Run

Good morning everyone!
 
Tomorrow will be our week 4 long run for the Rock 'n Roll St Louis Marathon. We will get started at the prescribed times below in the parking lot behind the Belleville St Louis Bread Company.
 
Half Marathoners – We will start at 8:00am and will be running 6 miles (see the complete schedule on our website). We will run 1 loop on our 5 mile route, but will add an extra mile (out and back) on the new bike trail. We will place signs on the course to indicate the turn for this extra section.  
 
Marathoners – We will start at 7:10am and are scheduled to run 15 miles (see the complete schedule on our website). We will run 3 loops on our 5 mile route. If you aren't familiar with the route, there are water fountains and restrooms on the course. We usually break for a couple of minutes at the end of the loop to get drinks of Gatorade, take a GU, etc.
 
A couple of other points:
 
-      We don't want to hear any excuses about being too slow or too fast. There will be pace groups for the 8, 9, 10, 11, 12, and 13 minute paces.
-      There will be some BRC provided refreshments at the end of the run (Gatorade, water, fruit).
 
Thanks,
Toby and Dan 








Tuesday, August 09, 2011

MetroBikeLink Opening Ceremony - 08/18/11 at 10:00am

Attached is a flyer for the Opening Ceremony for the new section of the bike trail on August 18th.



OPENING CEREMONY FOR
 
MetroBikeLink Bridge & Trail Extension To Swansea MetroLink Station
 
August 18, 2011 10:00 AM


MetroBikeLink Trail
North End Park to Swansea MetroLink Station
Owner - St. Clair County Transit District
Length: 8/10ths of a mile
4.7 miles Swansea Station to SWIC
2.8 miles Swansea Station to South Side Park via City of Belleville Richland Creek Greenway Trail
Width: 10 foot asphalt with 2 ft shoulders
Four Significant Bridges:
Over Richland Creek & Norfolk / Southern Railroad 3 span steel girder, 240' long
Over IL Rt. 159 3 span steel girder, 240' long
Two bridges over Swansea Creek Single span, pre-engineered, each 90' long
Richland Creek Bikeway Spur (Phase IIA)
Owner - Village of Swansea
Length: 4/10ths of a mile
When the final phase of this trail is completed in 2012, the total length will be 1.7 miles between MetroBikeLink and Old Collinsville Road, and potentially allow for the continued extension towards Shiloh and O'Fallon.
Future Enhancements
Swansea Station to Memorial Hospital MetroLink
Station
2.2 mile trail extension with grade separation bridge over Fullerton Road. Includes drinking fountains at Swansea & Memorial stations. Under construction. Should be completed Summer 2012.
MetroBikeLink Trail Bridge at Green Mount Road
New embankment and grade separation bridge over Green Mount Road on the existing trail near Southwestern Illinois College. In design. Planned for 2012-2013 construction.
SWIC Green Campus Initiative
A green campus initiative to create a more walkable campus, including a new loop trail off MetroBikeLink and around the campus perimeter.
SWIC Station to Scott AFB MetroLink Station
Proposed 3.5 mile trail extension.
Memorial Hospital Station to Fairview Heights
Station
Proposed 3.5 mile trail extension.
Additional Connecting Trails to MetroBikeLink
In construction, design or initial planning. Would further connect shorter, "local" trails of Belleville, Swansea & Fairview Heights to the "backbone" of the St. Clair County trail system.